Sesiragi Annex
15Original drawings are preserved. Their embedded annotations may remain in Korean; the project narrative and figure captions are available in English. Expand “Reading this drawing” below a figure for translated main labels or a reading guide where available. Select an image to inspect it at full resolution.
Planning of the annex's space, furniture, finishes, lighting, and services for a bookshop, together with fabrication and construction coordination. The project management role covered overall fabrication planning, excluding the outdoor courtyard design.
Project Overview
Sesiragi Annex is a bookshop-centered space for reading, conversation, and small gatherings. Connected to the operation of the cafe in the main building, it is planned as a separate place to spend time with books.
The role covered the annex's overall fabrication planning, including spatial design, furniture, finishes, lighting, and services, as well as project management of drawing production and revisions and fabrication and construction coordination. Geonryong Lee was responsible for the outdoor courtyard design.
Bookshop Planning
Linked to the ordering and beverage service functions of the main building, the annex places greater emphasis on reading and quiet stays. Everyday browsing and reading form its primary use, with possibilities for conversation and small events also considered.
Cafe operating experience informed the design through patterns of use and management requirements. The program and spatial development remain in progress and are distinguished here from operational outcomes after opening.
Space and Furniture
The annex's spatial organization and details were adjusted in relation to the main building's interior design. Bookshelves and pendant lighting were planned together to examine the relationship between book-display furniture and ceiling elements.
Interior drawings were revised to coordinate the locations and details of finishes, services, and furniture. The scope also extended to translating the spatial plan into fabrication and site discussions.
Reading this drawing
Interior elevations: shelving, openings and repeated vertical components are set out along the room.
Reading this drawing
The shelf is shown in plan, front and side elevation. The red instruction says to confirm caster and levelling-foot locations before fabrication. Detail 4 shows the chamfer to the plinth/skirting edge.
Bespoke Furniture
The bookshelf drawings document the connections between grid members and their assembly sequence. Horizontal and vertical members are distinguished from the perimeter frame, with the positions of lower casters and leveling feet marked for confirmation before fabrication. Chairs and tables were also studied in separate fabrication drawings.
Reading this drawing
The fabrication study calls for structural reinforcement beneath the seat. Plan, elevations and an axonometric show the chair’s frame.
Reading this drawing
The fabrication study calls for structural reinforcement beneath the tabletop. The drawings compare the top, frame and assembled table.
Timber Pendant Light
The pendant was designed to house an LED profile and power supply inside a timber member. Drawings define the machined section, wiring, and equipment positions, with instructions to confirm the actual component specifications and any interference with ceiling beams before fabrication.
Lighting diagrams examine how much of the light source and power supply is visible at different eye levels. They also record the limits of sectional studies and the need to examine sightlines in three dimensions. Fabrication photographs show the machined timber section and the placement of the profile and wiring.
Reading this drawing
Check for interference with the beam. Confirm the actual LED profile and fittings, then adjust the fabrication dimensions to suit. The timber section contains the LED and SMPS power supply; the routed recess is shown with straight and V-groove router profiles.
Reading this drawing
Lighting study: repeated suspended fittings are compared with standing figures and power-supply placement.
Reading this drawing
Light-source study: suspension height and spacing are compared with the occupied zone below.
Reading this drawing
Sightline study: rays from the suspended fittings are compared with eye level and a human field-of-view diagram.
Lighting and Installation Collaboration
An installation combining linear ceiling pendants and botanical art was planned, with discussion points prepared for botanical artist Eltrabai. The relationship between spatial planning and artwork installation was coordinated using the installation zones indicated on the drawings and reference images.
Topics for advance review included artwork loads, the need for pre-installed anchors and supports, methods of attachment to the pendants, available installation dates, and installation duration. Spatial and lighting design and installation coordination are distinguished from the botanical artist's fabrication role.
Reading this drawing
Interior study: the repeated timber elements overhead are highlighted in relation to shelving and tables.
Reading this drawing
Overhead-element study in plan: the highlighted bay is located within the repeated room grid.
Reading this drawing
Overhead-element study in section: the highlighted zone is compared with shelves, tables and the room height.
Electrical and Communications
Installation requirements for lighting, speakers, switches, and outlets were coordinated with the spatial and finish plans. Communications for the annex were studied in terms of the connection between the main building's router and the annex access point, along with installation positions and housing requirements.
Items to confirm before wall finishing included whether the power outlet plan had been incorporated into the drawings, the use of European-style recessed boxes, and power locations for ceiling speakers. This stage concerns confirmation that the plans are being implemented on site; it does not indicate completed installation.
Reading this drawing
The lighting legend identifies L-01 as a custom linear pendant, L-02 as an adjustable surface-mounted cylindrical light, and L-03 as an adjustable 1.5-inch COB light. The plan coordinates the repeated pendants with air-conditioning units and suspension wires.
Reading this drawing
Power plan: outlet locations and electrical points are coordinated with the internal layout.
Reading this drawing
The red notes request a speaker-suspension detail and confirmation of CCTV quantity and positions. The dashed connection runs from the wireless access point to the main building’s router. These notes record items still requiring coordination.
Reading this drawing
Lighting circuit plan: coloured switching routes connect the repeated linear pendants and perimeter lights.
Reading this drawing
Finish plan: coloured perimeter lines and hatching identify the wall and floor material zones.
Construction Management
Construction management connected drawing revisions, material and detail reviews, fabrication and installation scheduling, and site checks. Ongoing wall, window, and finish works were checked for coordination, with requests for advance inspection of electrical and building service items that would become difficult to access after finishing.
Where construction proceeded alongside the main building's cafe operation, exposure of construction areas and noise were checked, and protective measures were requested. Site requests and their implementation status were communicated separately to the contractor.
Early Studies
The October 2025 expansion study compared alternative bookshelf and seating layouts. Models explored a communal table with low bookshelves, parallel shelving, and shelving combined with window seating. These materials document design development; the current proposal is identified separately by the bookshop drawing set dated September 9, 2026.
Reading this drawing
The axonometric compares the arrangement of furniture, shelving and circulation. Korean text in the footer is part of the original presentation-sheet identification.
Reading this drawing
The axonometric compares the arrangement of furniture, shelving and circulation. Korean text in the footer is part of the original presentation-sheet identification.
Reading this drawing
The axonometric compares the arrangement of furniture, shelving and circulation. Korean text in the footer is part of the original presentation-sheet identification.
Responsibilities
Seyeong Choi: Overall fabrication planning for the annex, excluding the outdoor courtyard; spatial, furniture, finish, lighting, and services planning; drawing production and revisions; fabrication and construction coordination; and project management.
Geonryong Lee: Outdoor courtyard design for the annex.
Eltrabai: Botanical art collaboration. Coordination of the installation with the space and lighting was part of the annex project management role.
Progress
Under construction as of September 2026. This page records the spatial development plan and the design, fabrication, and construction management process.